Des traductions sont fournies pour aider les utilisateurs. Veuillez noter que toutes les données saisies dans le système doivent l'être uniquement en anglais.
Des traductions sont fournies pour aider les utilisateurs. Veuillez noter que toutes les données saisies dans le système doivent l'être uniquement en anglais.
Project Name: | Corridor Vc - Ovcari - Tunnel Prenj - Mostar North |
EBRD Project ID: | 51700 |
Country: | Bosnia And Herzegovina |
Client Name: | MOTORWAYS OF THE FEDERATION OF BOSNIA AND HERZEGOVINA LTD |
Type of Procurement: | Works,Consultancy |
Business Sector: | Transport |
Notice Type: | General Procurement Notice |
Publication Date: | 07/02/2020 16:09 |
Opportunity Status | |
This opportunity is for information purposes only | |
This opportunity is not yet open for response | |
This opportunity is now open for response | |
This opportunity is now closed for response | |
Access Opportunity | |
This opportunity is for information purposes only | |
This is a General Procurement Notice and cannot be responded to directly. |
1. Funding Details
The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project.
Additional financing information:
The PC Motorways of the Federation of Bosnia and Herzegovina Ltd has submitted to the Bank their intention to use the proceeds of a loan from the European Bank for Reconstruction and Development (the “Bank”) in the amount of EUR 97,2 million and a loan from the European Investment Bank (EIB) in the amount of EUR 97,2 million to finance the construction of priority motorway sections along the international transport Corridor Vc. The remaining funds for the project, which has a total estimated cost of EUR 249,6 million, shall be secured from the expected WBIF grant and Employer’s own funds. The total Estimated Project Value includes the estimated cost for implementation of the three envisaged motorway sections as presented below.
2. Information on the Project
Project Description:
The proposed project will require the procurement of the following goods, works and services:
Construction of the following motorway section:
• Section Tunnel Prenj (length = 12,4 km)
• Section Ovčari - Prenj (to be defined)
• Section Prenj - Mostar North (to be defined)
Consultancy services for the following activities:
• Supervision and technical assistance of the section Tunnel Prenj (length = 12,4 km)
• Supervision of the section Ovčari - Prenj (to be defined)
• Supervision of the section Prenj - Mostar North (to be defined)
Tendering for the Tunnel Prenj Section is expected to begin in the second half of 2020.
Estimated Total Project Value
540,000,000.00
Currency
EUR
Procurement Type
Works,Consultancy
Estimated Start Date of Procurement
30/11/2020.
3. Other Information
Reference is made to the General Procurement Notice published on 18/12/2019 at ECEPP EBRD web site on the following link: https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=10250605
Information regarding the road-show event shall be changed to read as follows:
Interested Consultancy firms are invited to attend the three-day road-show event for Tunnel Prenj at PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar, street Hamdije Kreševljakovića 19, 71 000 Sarajevo, Bosnia and Herzegovina in the period from 16th March to 18th March 2020. Tentative agenda for the road-show event is as follows:
1st day - 16th March 2020 at 11:00 hrs (local time)
o Client’s presentation of Tunnel Prenj project
o Consultant’s presentation of their company(ies) (approx. 15 min per presentation)
o Conclusions
2nd day - 17th March 2020 at 11:00 hrs (local time)
o Site visit
3rd day - 18th March 2020 at 11:00 hrs (local time)
o Discussion on project requirements (technical requirements, available information and its reliability, assumption on project/contract risks, project timing, budget etc.)
Attendance at the road-show event is envisaged for Consultants from the relevant filed and substantial experience in tunnel and underground consultancy projects (Design, supervision and project management). All interested Consultancy firms are required to register their attendees at the following contacts below:
Client Address:
Mrs. Lejla Hodžić and Mr. Tarik Duraković
PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar
Hamdije Kreševljakovića 19, Sarajevo, 71 000, Bosnia And Herzegovina
Tel. +387 (0) 33 277 922 and +387 (0) 33 277 966
Email: h.lejla@jpautoceste.ba and d.tarik@jpautoceste.ba
For the purpose of registration, Consultants are required to fill the form available at the link https://www.dropbox.com/sh/qiimgtat11dzlvy/AAAiPKu_4LnVaDi6odsx9zTNa?dl=0 and are invited to provide their company profiles and brochures.
After registration, all Consultants will be provided with the detail agenda for the event and available project documentation.
Participation at the event is free of charge. Client will organize logistic and venue for the event, but the Consultants will cover transportation and accommodation costs.
It is envisaged that invitation to submit Expression of Interest will follow shortly this event; however, attendance to the road-show event is not mandatory for participation in subsequent Tendering processes.
All other information stipulated in the GPN shall remain unchanged.
4. Client Address
Mrs. Lejla Hodžić and Mr. Tarik Duraković
PC Motorways of the Federation of Bosnia and Herzegovina Ltd Mostar
Hamdije Kreševljakovića 19
SarajevoEmail: h.lejla@jpautoceste.ba
71 000
Bosnia And Herzegovina
Tel. +387 (0) 33 277 922 and +387 (0) 33 277 966