Skip to main content.

  • Attention

    Translation are provided to assist users. Please note that any data entered into the system must only be entered in English.


    OK

    Attention

    Translation are provided to assist users. Please note that any data entered into the system must only be entered in English.


    OK

Bosnia And Herzegovina: Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2

Invitation For Prequalification

Project Name: Corridor Vc - Doboj Bypass
EBRD Project ID: N/A
Country: Bosnia And Herzegovina
Client Name: Republika Srpska Motorways
ECEPP ID: 11336862
Procurement Exercise Name: Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2
Procurement Exercise Description: Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2
Type of Procurement: Works
Procurement Method: Open Tender Single Stage with PQQ
Business Sector: Transport
Notice Type: Invitation For Prequalification
Publication Date: 15/04/2020 07:53
Issue Date: 15/04/2020 14:00
Closing Date: 18/05/2020 09:00
Opportunity Status
This opportunity is for information purposes only
This opportunity is not yet open for response
This opportunity is now open for response
This opportunity is now closed for response
Access Opportunity
This opportunity is now closed for response
This opportunity is now closed for all supplier responses. Please refer to the closing date noted on this page.

Invitation For Prequalification

1. Funding Details

The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named contract(s).

Additional financing information:
No Other Information Provided.


2. Information on the Procurement Exercise

Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.

The type of procurement and the procurement method is stated above. A full description of the procurement exercise is available within the documentation and available free of charge on ECEPP.

The documentation will include such information as: detailed technical and financial requirements; any information on lots; the expected outcome; eligibility and qualification requirements; contract start date; planned contract duration; any response requirements; any other relevant information.

This procurement exercise will be conducted using the EBRD Client E-Procurement Portal (ECEPP). Prospective participants can access the procurement exercise by clicking on the below link or on the 'Access Opportunity' button (if viewing this notice on ECEPP). Registered participants may log in and access the documentation immediately and unregistered participants may do so after completing a brief registration:

https://ecepp.ebrd.com/respond/3ZW865B4S4


3. Other Information
The Employer now invites interested Participants for the Prequalification Phase of Design and Construction of the following Works to be funded from part of the proceeds of the loan:

Main Works: Construction of 5,6 km of new Motorway including all related local roads and following major structures:

• Dual tube tunnel “Putnikovo Brdo 1” in total length of 1,6 km
• Dual tube tunnel “Putnikovo Brdo 2” in total length of 700m (This section includes the last 150 metres of the tunnel that are located within the FBH)
• Bridge “Rudanka” over river Bosna
• Viaduct “Putnikovo Brdo”

General description

Design and Construction of 2+2 lane motorway (with central median and emergency lanes) which may include some or all of the following:

• Earthworks / Embankments
• Road Pavements
• Bridgeworks
• Piling works
• Tunnelling works
• Interchanges and link roads
• Steel / Concrete vehicle Safety Barriers
• Local Road works : under/overpasses
• Local road re-alignments, diversions, closures
• Drainage, culverts and river protection Works
• Provision of Motorway communications, emergency telephones
• Lighting
• Fencing
• Lining, signing, variable message signs
• Electrical Works
• Environmental Works
• Meteorological stations
• Toll Stations and associated pavements, buildings, highway links
• Motorway Compounds and associated pavements, buildings, highway links
• Weigh-in-motion sites

Expected duration of the Contract is 1095 days (three years) plus Defect Notification Period of 730 days (two years) .

This procurement exercise replaces the tender invitation issued at https://www.ebrd.com/work-with-us/procurement/p-pn-200214a.html. That tender invitation issued on February 17, 2020 is now cancelled due to limitations faced under current circumstances produced by COVID-19 which limits the distribution, submission and access to paper-based information. The new tender exercise set in ECEPP will be conducted under prequalification stage plus single stage tender under EBRD PP&R.


4. Client Address
The client's address is for information only. To register interest, access the documentation using the available links. Participants must use the ECEPP message centre for communication with the client.
Davor Vuckovic
Motorway Construction Public Company “Republic of Srpska Motorways” Banja Luka
Vase Pelagića no. 10
Banja Luka, Republic of Srpska
78000
Bosnia And Herzegovina
Tel. +387 51 233 670
Email: dvuckovic@autoputevirs.com