Bosnia And Herzegovina: Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2

Notice of Prequalified Participants

Project Name: Corridor Vc - Doboj Bypass
EBRD Project ID: N/A
Country: Bosnia And Herzegovina
Client Name: Republika Srpska Motorways
ECEPP ID: 11336862
Procurement Exercise Name: Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2
Type of Procurement: Works
Procurement Method: Open Tender Single Stage with PQQ
Business Sector: Transport
Notice Type: Notice of Prequalified Participants
Publication Date: 02/10/2020 10:52
Opportunity Status
This opportunity is for information purposes only
This opportunity is not yet open for response
This opportunity is now open for response
This opportunity is now closed for response
Access Opportunity
This opportunity is for information purposes only
This is a Notice of Prequalified Participants and is for information only.

Notice of Prequalified Participants



1. Notice of Prequalified Participants list

The following participants have been prequalified for the above procurement exercise:

Companies

JVCAs



2. Other Information


The Employer now invites interested Participants for the Prequalification Phase of Design and Construction of the following Works to be funded from part of the proceeds of the loan:

Main Works: Construction of 5,6 km of new Motorway including all related local roads and following major structures:

• Dual tube tunnel “Putnikovo Brdo 1” in total length of 1,6 km
• Dual tube tunnel “Putnikovo Brdo 2” in total length of 700m (This section includes the last 150 metres of the tunnel that are located within the FBH)
• Bridge “Rudanka” over river Bosna
• Viaduct “Putnikovo Brdo”

General description

Design and Construction of 2+2 lane motorway (with central median and emergency lanes) which may include some or all of the following:

• Earthworks / Embankments
• Road Pavements
• Bridgeworks
• Piling works
• Tunnelling works
• Interchanges and link roads
• Steel / Concrete vehicle Safety Barriers
• Local Road works : under/overpasses
• Local road re-alignments, diversions, closures
• Drainage, culverts and river protection Works
• Provision of Motorway communications, emergency telephones
• Lighting
• Fencing
• Lining, signing, variable message signs
• Electrical Works
• Environmental Works
• Meteorological stations
• Toll Stations and associated pavements, buildings, highway links
• Motorway Compounds and associated pavements, buildings, highway links
• Weigh-in-motion sites

Expected duration of the Contract is 1095 days (three years) plus Defect Notification Period of 730 days (two years) .

This procurement exercise replaces the tender invitation issued at https://www.ebrd.com/work-with-us/procurement/p-pn-200214a.html. That tender invitation issued on February 17, 2020 is now cancelled due to limitations faced under current circumstances produced by COVID-19 which limits the distribution, submission and access to paper-based information. The new tender exercise set in ECEPP will be conducted under prequalification stage plus single stage tender under EBRD PP&R.