Project Name: | Corridor Vc - Doboj Bypass |
EBRD Project ID: | N/A |
Country: | Bosnia And Herzegovina |
Client Name: | Republika Srpska Motorways |
ECEPP ID: | 11336862 |
Procurement Exercise Name: | Construction of 6 km long motorway section between Rudanka Interchange and the south end of the tunnel Putnikovo Brdo 2 |
Type of Procurement: | Works |
Procurement Method: | Open Tender Single Stage with PQQ |
Business Sector: | Transport |
Notice Type: | Notice of Prequalified Participants |
Publication Date: | 02/10/2020 10:52 |
Opportunity Status | |
This opportunity is for information purposes only | |
This opportunity is not yet open for response | |
This opportunity is now open for response | |
This opportunity is now closed for response | |
Access Opportunity | |
This opportunity is for information purposes only | |
This is a Notice of Prequalified Participants and is for information only. |
1. Notice of Prequalified Participants list
The following participants have been prequalified for the above procurement exercise:
Companies
JVCAs
2. Other Information
The Employer now invites interested Participants for the Prequalification Phase of Design and Construction of the following Works to be funded from part of the proceeds of the loan:
Main Works: Construction of 5,6 km of new Motorway including all related local roads and following major structures:
• Dual tube tunnel “Putnikovo Brdo 1” in total length of 1,6 km
• Dual tube tunnel “Putnikovo Brdo 2” in total length of 700m (This section includes the last 150 metres of the tunnel that are located within the FBH)
• Bridge “Rudanka” over river Bosna
• Viaduct “Putnikovo Brdo”
General description
Design and Construction of 2+2 lane motorway (with central median and emergency lanes) which may include some or all of the following:
• Earthworks / Embankments
• Road Pavements
• Bridgeworks
• Piling works
• Tunnelling works
• Interchanges and link roads
• Steel / Concrete vehicle Safety Barriers
• Local Road works : under/overpasses
• Local road re-alignments, diversions, closures
• Drainage, culverts and river protection Works
• Provision of Motorway communications, emergency telephones
• Lighting
• Fencing
• Lining, signing, variable message signs
• Electrical Works
• Environmental Works
• Meteorological stations
• Toll Stations and associated pavements, buildings, highway links
• Motorway Compounds and associated pavements, buildings, highway links
• Weigh-in-motion sites
Expected duration of the Contract is 1095 days (three years) plus Defect Notification Period of 730 days (two years) .
This procurement exercise replaces the tender invitation issued at https://www.ebrd.com/work-with-us/procurement/p-pn-200214a.html. That tender invitation issued on February 17, 2020 is now cancelled due to limitations faced under current circumstances produced by COVID-19 which limits the distribution, submission and access to paper-based information. The new tender exercise set in ECEPP will be conducted under prequalification stage plus single stage tender under EBRD PP&R.
3. Client Information
Not Provided