Serbia: Heavy Maintenance (Upgrading) of the State Road IA 1, Section: Razanj Interchange – Aleksinac Interchange, from km 385+067 to km 408+778,710, L=23.711 km (left carriageway lane), Contract ID: RRSP/RRW-IA1RA/2020-08

Ebrd Contract Award Notice

Project Name: Road Rehabilitation and Safety Project
EBRD Project ID: 44750
Country: Serbia
Client Name: Republic of Serbia; the Project Entity is 'PE Roads of Serbia'
ECEPP ID: 10438099
Procurement Exercise Name: Heavy Maintenance (Upgrading) of the State Road IA 1, Section: Razanj Interchange – Aleksinac Interchange, from km 385+067 to km 408+778,710, L=23.711 km (left carriageway lane), Contract ID: RRSP/RRW-IA1RA/2020-08
Procurement Method: Open Tender Single Stage
Business Sector: Transport
Notice Type: Ebrd Contract Award Notice
Publication Date: 06/10/2021 17:07
Opportunity Status
This opportunity is for information purposes only
This opportunity is not yet open for response
This opportunity is now open for response
This opportunity is now closed for response
Access Opportunity
This opportunity is for information purposes only
This is a Ebrd Contract Award Notice and cannot be responded to directly.

Ebrd Contract Award Notice

Tender/Contract Reference No: 10438099: Heavy Maintenance (Upgrading) of the State Road IA 1, Section: Razanj Interchange – Aleksinac Interchange, from km 385+067 to km 408+778,710, L=23.711 km (left carriageway lane), Contract ID: RRSP/RRW-IA1RA/2020-08

Scope Of Contract: The civil works will consist of (but shall not be limited to) the following:

*Preliminary works which include removal of trees and shrubs, demolition (removal) of existing carriageway structure, excavation for determining position of underground installations – cutting grips, demolition and removal of existing curbs, demolition and removal of certain parts of existing drainage system, removal of asphalt layers by scraping, repair to cracks;
*Substructure works which include topsoil removal, wide excavation, excavation of new canals, construction of embankment, topsoiling of shoulders; slope lining with stone cubes;
*Superstructure works which includes construction of pavement structure; unbound base course of crushed stone, bituminous base course, wearing course; supply and installation of concrete curbs; improvement of pavement drainage;
*Works on structures which includes works on bridges: works on demolition, removing and dismantling (asphalt and carriageway structure, waterproofing, existing curbs, concrete structure of footway, damaged and degraded protective layer of concrete etc.), earthworks, work of construction, installation, replacing and dismantling of steel tubular fixed scaffold with working platforms for execution of works, concrete works (works on concrete bridge inspection paths and edge cornices, widening wing walls, works on concreting of access ramps), works on concrete surfaces (grouting fissures, repair to concrete surfaces with sanitary mortar), waterproofing works, construction of pavement structure, installation of carbon strips, construction and filling joints etc.. Also works on structures includes works on existing culverts: cleaning works (removal of shrubs and trees, cleaning culverts), excavation in the base of stone lining on culverts’ entrances, preparation of stone lining on a part of both entrances to the culvert, construction of threshold in cement mortar and works on retaining walls (earth excavation, concrete works on structures and support elements, reinforced works, protection works);
*Works on drainage system improvement which includes earthworks, works on closed drainage system, supply and installation of manholes and separators, replacement of drainage – discharge system, etc;
*Roadside arrangement and placement of traffic signalization and road furniture.

The Works will be performed under traffic with a strong emphasis on maintaining safe conditions for both the flow of traffic and the works in progress.

Duration of Contract: 487 days

Contract Award Date: 06/08/2021




Awarded Tenderer(s):

Sinohydro Corporation Limited
ROOM 601, BUILDING 23, NO.17 XICUI ROAD HAIDIAN DISTRICT
HAIDIAN DISTRICT
100036
China

Tender price at tender opening: EUR 19,430,767.04
Evaluated Tender Price (in evaluation currency): EUR 15,192,305.87
Evaluated Tender Price (Euro Equivalent): € 15,192,305.87
Contract Price (in evaluation currency): EUR 16,192,305.87
Contract Price (Euro Equivalent): € 16,192,305.87

Is this a JVCA: No

Evaluated Tenderer(s):

Energoprojekt Niskogradnja AD Beograd
Bulevar Mihaila Pupina 12, Bulevar Mihaila Pupina 12, Bulevar Mihaila Pupina 12
Belgrade
11000
Serbia

Tender price at tender opening: EUR 21,618,972.29
Evaluated Tender Price (in evaluation currency): EUR 17,015,810.24
Evaluated Tender Price (Euro Equivalent): € 17,015,810.24
Reason For Rejection: ${tenderer.reason}

Is this a JVCA: No


JV "SRBIJAAUTOPUT – VOJPUT"

Tender price at tender opening: EUR 23,878,174.93
Evaluated Tender Price (in evaluation currency): EUR 18,898,479.11
Evaluated Tender Price (Euro Equivalent): € 18,898,479.11
Reason For Rejection: ${tenderer.reason}

Is this a JVCA: Yes

JVCA Details:
SRBIJAAUTOPUT DOO BEOGRAD
str. Ljube Čupe no. 5
Belgrade, Serbia, 11000
Lead partner: Yes
VOJPUT DOO SUBOTICA
str. Đure Đakovića no.10
Subotica, Serbia, 24000
Lead partner: No


TRACE GROUP HOLD PLC & TRACE SRBIJA AD NIŠ

Tender price at tender opening: EUR 20,867,229.12
Evaluated Tender Price (in evaluation currency): EUR 16,389,357.60
Evaluated Tender Price (Euro Equivalent): € 16,389,357.60
Reason For Rejection: ${tenderer.reason}

Is this a JVCA: Yes

JVCA Details:
TRACE GROUP HOLD PLC
12 „Nikola Obrazopisov” Str.
Sofia, Bulgaria, 1408
Lead partner: Yes
TRACE SRBIJA AD NIŠ
13-a Generala Tranieja Str.
Niš, Serbia, 18000
Lead partner: No