Invitation For Tenders Two Stage
1. Funding Details
The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named contract(s).
Additional financing information:
Co-financing for the Project will be provided by the European Investment Bank ("EIB") in the amount of EUR 126 Million and by EU Neighbourhood Investment Facility ("NIF") under a grant in the amount of EUR 30 Million.
2. Information on the Procurement Exercise
Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.
The type of contract and the procurement method is stated above. A full description of the procurement exercise is available within the documentation and is available free of charge in ECEPP.
The documentation will include such information as: detailed technical and financial requirements; any information on lots; the expected outcome; eligibility and qualification requirements; contract start date; planned contract duration; any response requirements; any other relevant information.
This procurement exercise will be conducted using the EBRD Client E-Procurement Portal (ECEPP). Prospective participants can access the procurement exercise by clicking on the below link or on the 'Access Opportunity' button (if viewing this notice on ECEPP). Registered participants may log in and access the documentation immediately and unregistered participants may do so after completing a brief registration:
https://ecepp.ebrd.com/respond/Y73J5SN33Q
3. Other Information
The Scope of Works for this Contract has two Sections. Works to be carried out within Section I is to design and construct a new mechanical sludge dewatering system to serve the existing and the in-situ Agamiyeen WWTP expansion. Section II Works are : (i) to design and construct the substantial in-situ wastewater treatment plant expansion with a Stage 1 capacity of 11,000 m3/d. A number of elements of Stage 1 will be sized to facilitate the expansion of the WWTP to treat the Stage 2 design capacity of 22,000 m3/d, (ii) to provide Operation and Maintenance Training for the Employer’s Staff and supervise the operation and maintenance of the WWTP during the Defects Notification Period.
4. Client Address
The client's address is for information only. To register interest, access the documentation using the available links. Participants must use the ECEPP message centre for communication with the client.
Eng. Tarek Bekhit
Holding Company for Water and Wastewater (HCWW)
Kornish El Nil - Rod El Farag, Rod El Farag Water Treatment Plant - El Sahel
Cairo
11631
Egypt
Tel. 01222481908
Email: tarek.bekhit@hcww.com.eg