General Procurement Notice
1. Funding Details
The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project.
Additional financing information:
The project is jointly co-financed by AFD
EBRD Loan: up to 75,000,000 EUR subject to approval
AFD Loan: up to 75,000,000 EUR subject to approval
2. Information on the Project
Project Description:
Civil works and supply of materials for a 67-km long water transmission line, a drinking water treatment plant with a capacity of 300,000
m3/day and three water reservoirs with a total volume of 21,000 m3.
The proposed project, which has a total estimated cost of 150 million EUR, will require the procurement of the following components:
1. Construction of 67-k m long water transmission line
2. Supply of materials (pipes, valves and other) for 67-km long water transmission line
3. Construction of a drinking water treatment plant with a capacity of 300,000 m3/day
4. Works supervision services
Estimated Total Project Value
150,000,000.00
Currency
EUR
Procurement Type
Goods,Works,Consultancy
Estimated Start Date of Procurement
07/03/2023.
3. Other Information
Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.
Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP (https://ecepp.ebrd.com). Registered entities will be notified directly when any procurement opportunities are published.
4. Client Address
Alaattin Gungordu
Head of Treatment Plants Department
Bursa Water and Sewage Administration (BUSKI) General Directorate
Sirameseler Mah. Avrupa Konseyi Bulvarı No:6/3 D Blok Osmangazi
Bursa
16190
Turkey
Tel. +90 224 270 27 17
Email: agungordu@buski.gov.tr