General Procurement Notice
1. Funding Details
The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named project.
Additional financing information:
An EBRD loan of UDS 22 million, to be co-financed by investment grant of USD 8 million from HIPCA and a TC grant of USD 0.8 million from the EBRD Shareholders Special Fund.
2. Information on the Project
Project Description:
This Project is an expansion of the MR3:West Irbid Wastewater Project (ID 48496).
Estimated Total Project Value
30,800,000.00
Currency
USD
Procurement Type
Works,Consultancy
Estimated Start Date of Procurement
12/08/2024.
3. Other Information
Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.
Procurement under this project will be conducted using the EBRD Client E-Procurement Portal (ECEPP). If you intend to participate in any procurement under this project, please ensure that you have registered in ECEPP (https://ecepp.ebrd.com). Registered entities will be notified directly when any procurement opportunities are published.
The Ministry of Water and Irrigation (“MWI”) and the Water Authority Jordan (“WAJ”) have approached the European Bank for Reconstruction and Development (the “EBRD” or the “Bank”) to support the preparation and financing of Design and Construction of West Irbid Wastewater Treatment Plant and Siphons, including design, procurement, construction, erection and testing, commissioning, operation, training, etc.
The treatment plant will serve the West Irbid Wastewater Networks Project which is under construction and covers 17 towns within the municipality of West Irbid namely, part of Natfeh (un sewered part), Kufr Yuba, Zahar, Jumhaa, Ham, Bayt Yafa, Soum (un sewered part), Jijin, Doughara, and Kufr Rahta, and Al Wastia Municipality namely Kufr Asad, Qumm, Qumaym, Kufr An, Saydour, Hofa Wastia, Kharaj and Greater Irbid Municipality for part of Natfeh village, and includes 7 pumping stations distributed in these towns. West Irbid Wastewater Networks project divided into (7) packages, in which:
- Five (5) packages (namely package 2,3,4,5, and 6) include only wastewater networks.
- Package 1 consists of 4 pumping stations and force mains.
- Package 7 consists of 3 pumping stations and force mains in addition to wastewater networks for three out of the 17 towns.
The sewer networks include Corrugated HDPE/ pipelines of about 460 km, ranging in design diameter between 200 and 600mm, 600m DI pipelines of 200mm nominal diameter, 950m steel pipeline of 200mm nominal diameter; 8km of DI force mains ranging in between 150 and 300 mm; and approximately 80 km of house connections of 160 mm HDPE pipes.
4. Client Address
Eng. Rua AlSoub
Water Authority of Jordan
Water Authority of Jordan
Jaber bin Hayyan Street- Shmeisani, P.O. Box 2412- Amman 11183 Jordan
Amman
11183
Jordan
Tel. 00962797378372
Email: rua_alsoub@mwi.gov.jo