Jordan: Package 2*: Construction of Collection Systems and Relted Gravity Trunk Lines for the Towns of Kufr Asad and Qumm

Invitation For Tenders Single

Project Name: WEST IRBID WASTEWATER NETWORK PROJECT
EBRD Project ID: 48496
Country: Jordan
Client Name: Water Authority Jordan (WAJ)
ECEPP ID: 28450302
Procurement Exercise Name: Package 2*: Construction of Collection Systems and Relted Gravity Trunk Lines for the Towns of Kufr Asad and Qumm
Procurement Exercise Description: Package 2*: Construction of Collection Systems and Relted Gravity Trunk Lines for the Towns of Kufr Asad and Qumm
Type of Procurement: Works
Procurement Method: Open Tender Single Stage
Business Sector: Municipal and Environmental Infrastructure
Notice Type: Invitation For Tenders Single
Publication Date: 25/08/2024 06:44
Issue Date: 27/08/2024 10:00
Closing Date: 10/12/2024 10:00
Opportunity Status
This opportunity is for information purposes only
This opportunity is not yet open for response
This opportunity is now open for response
This opportunity is now closed for response
Access Opportunity
This opportunity is now open for response
This opportunity is now open for you to view the documents loaded by the named client. Please use the "Access Opportunity" button to register/log in, view the documents and, if required, complete your response for this opportunity.

Invitation For Tenders Single

1. Funding Details

The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named contract(s).

Additional financing information:
The contract will be financed by an EBRD loan, EU, SSF and GCFF.

2. Information on the Procurement Exercise

Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.

The type of contract and the procurement method is stated above. A full description of the procurement exercise is available within the documentation and is available free of charge in ECEPP.

The documentation will include such information as: detailed technical and financial requirements; any information on lots; the expected outcome; eligibility and qualification requirements; contract start date; planned contract duration; any response requirements; any other relevant information.

This procurement exercise will be conducted using the EBRD Client E-Procurement Portal (ECEPP). Prospective participants can access the procurement exercise by clicking on the below link or on the 'Access Opportunity' button (if viewing this notice on ECEPP). Registered participants may log in and access the documentation immediately and unregistered participants may do so after completing a brief registration:

https://ecepp.ebrd.com/respond/588ZSYJ439


3. Other Information
Work for this Package shall include, the followings:
• Construction of a new gravity sewer pipelines of corrugated HDPE pipe ranging in diameter between 200 mm and 600 mm, including related concrete manholes. The total lengths of the sewer pipelines are about 45 km, out of which about 3.5 km of these lengths are trunklines to be laid in Wadis.
• 10 km of house connections of corrugated HDPE pipes of 160 mm.
• Installation of sewer pipelines of 200 mm using the Project approved pipe material, by trenchless construction methods for installation of pipelines under major/main highways, for deep Pipelines and where the open cut method couldn’t be applied.
• Construction of new sewer pipelines of ductile iron pipe ranging in diameter between 200 mm and 600 mm (nominal diameter), including related concrete manholes. The total lengths of the ductile iron sewer pipelines are 1.5 km.
• Optional Item which includes:
- Construction of 8.4 km new gravity sewer pipelines of corrugated HDPE pipe of 200 mm in diameter, including related concrete manholes.
- 1.0 km of house connections of corrugated HDPE pipes of 160 mm.
- Construction of new sewer pipelines of 240 m ductile iron pipe of 200 mm in diameter (nominal diameter), including related concrete manholes.
• Time for Completion: 540 days (180 months)

The Site visit will take place in Al Wastia Municipality Building on the date 25th September 2024 at 10:00 AM Jordan Time

4. Client Address
The client's address is for information only. To register interest, access the documentation using the available links. Participants must use the ECEPP message centre for communication with the client.
Eng. Rua AlSoub
Water Authority of Jordan
Water Authority of Jordan
Shmesani PO Box 5012
Amman
1118
Jordan
Tel. +96-6-5680100