Перевод предоставляется в помощь пользователям. Обратите внимание, что любые данные, вводимые в систему, необходимо вводить только на английском языке.
Перевод предоставляется в помощь пользователям. Обратите внимание, что любые данные, вводимые в систему, необходимо вводить только на английском языке.
Project Name: | |
Notice Type: |
Opportunity Status | |
This opportunity is for information purposes only | |
This opportunity is not yet open for response | |
This opportunity is now open for response | |
This opportunity is now closed for response | |
Access Opportunity | |
This opportunity is for information purposes only | |
This is a and cannot be responded to directly. |
Addendum
Date of Addendum: 07/06/2018
Reason for Addendum: CORRECTION TO THE TEXT OF THE ORIGINAL NOTICE:
INSTEAD OF:-
The procurement of works includes the procurement of materials and execution of works on the Reconstruction and expansion of sewerage system of the settlements Donje Ledenice; Gornje Ledenice and urban part of the Municipality of Gradačac, as follows:
A) Setllement Donje Ledenice: Construction of sewerage collectors and secondary network in the total length of L=6.193,00m with four (4) pumping stations (pumping shaft) and construction of main pumping station “Ledenice” .
B) Settlement Gornje Ledenice: Construction of sewerage collectors and secondary network in the total length of L= 8.416,00m; pressure collectors in the length of L=2.873,00m with five (5) inception shaft with air valve and three (3) pumping stations (pumping shaft).
The above mentioned collectors in the area of Gornje Ledenice and Donje Ledinice settlement drain water to the main Pumping station "Ledenice", which is designed to pump the waste water to the existing WWTP (recently reconstructed).
PLEASE READ:-
The procurement of works includes the procurement of materials and execution of works on the Reconstruction and expansion of sewerage system of the settlements Donje Ledenice; Gornje Ledenice and urban part of the Municipality of Gradacac, as follows:
A) Setllement Donje Ledenice: Construction of sewerage collectors and secondary network in the total length of L=6.193,00m with four (4) pumping stations (pumping shaft) and construction of main pumping station Ledenice.
B) Settlement Gornje Ledenice: Construction of sewerage collectors and secondary network in the total length of L= 8.416,00m; pressure collectors in the length of L=2.873,00m with five (5) inception shaft with air valve and three (3) pumping stations (pumping shaft).
The above mentioned collectors in the area of Gornje Ledenice and Donje Ledinice settlement drain water to the main Pumping station Ledenice;, which is designed to pump the waste water to the existing WWTP (recently reconstructed).
Nature of Addendum: Correction/Clarification
Client Address:
DAMIR OKANOVIC - DIRECTOR OF JP KOMUNALAC d.d.
JP KOMUNALAC d.d.
JP KOMUNALAC d.d.
H.K.Gradascevica 114, Gradacac, 76250 , Bosnia And Herzegovina
Tel. 00387 35 817 219 , Email: gradacac.damir@gmail.com