Skip to main content.

  • Attention

    Перевод предоставляется в помощь пользователям. Обратите внимание, что любые данные, вводимые в систему, необходимо вводить только на английском языке.


    OK

    Attention

    Перевод предоставляется в помощь пользователям. Обратите внимание, что любые данные, вводимые в систему, необходимо вводить только на английском языке.


    OK

North Macedonia: Construction Supervision services FIDIC Engineer

Invitation For Expression Interest

Project Name: Railway Corridor VIII Phase II Construction of Rail Corridor VIII, Beljakovce - Kriva Palanka section
EBRD Project ID: 44175
Country: North Macedonia
Client Name: Public Enterprise for Railway Infrastructure Railways of Republic of North Macedonia Skopje
ECEPP ID: 9382198
Procurement Exercise Name: Construction Supervision services FIDIC Engineer
Procurement Exercise Description: FIDIC Engineer Supervision services
Type of Procurement: Consultancy
Procurement Method: Consultancy Two Stage Open
Business Sector: Transport
Notice Type: Invitation For Expression Interest
Publication Date: 07/02/2020 12:15
Issue Date: 03/02/2020 17:00
Closing Date: 16/03/2020 12:00
Opportunity Status
This opportunity is for information purposes only
This opportunity is not yet open for response
This opportunity is now open for response
This opportunity is now closed for response
Access Opportunity
This opportunity is now closed for response
This opportunity is now closed for all supplier responses. Please refer to the closing date noted on this page.

Invitation For Expression Interest

1. Funding Details

The above named client intends to use part of the proceeds of a loan from/grant administered by the European Bank for Reconstruction and Development (the Bank) towards the cost of the above named contract(s).

Additional financing information:
WBIF Grant

2. Information on the Procurement Exercise

Contracts will be subject to the Bank's Procurement Policies and Rules and are open for participation for firms from any country, unless otherwise specified in the procurement documents.

The type of procurement and the procurement method is stated above. A full description of the procurement exercise is available within the documentation and available free of charge on ECEPP.

The documentation will include such information as: detailed technical and financial requirements; any information on lots; the expected outcome; eligibility and qualification requirements; contract start date; planned contract duration; any response requirements; any other relevant information.

This procurement exercise will be conducted using the EBRD Client E-Procurement Portal (ECEPP). Prospective participants can access the procurement exercise by clicking on the below link or on the 'Access Opportunity' button (if viewing this notice on ECEPP). Registered participants may log in and access the documentation immediately and unregistered participants may do so after completing a brief registration:

https://ecepp.ebrd.com/respond/KK42RPGKDY


3. Other Information
Construction works on this railway line commenced in 1996 and were halted in 2004. The greater part of the railway embankments, cuts and the majority of the structures (bridges, underpasses, culverts, retaining walls etc.), have been partly constructed. Many railway and road bridges either have remained unfinished or their construction has not even commenced, the same applies to tunnels. Although the new railway alignment traverses the existing road network at several locations, all respective under-/overpasses are yet to be constructed. The relocation of most of the existing infrastructure (long distant power lines, waters supply, sewerages, pipelines etc.) has already been carried out. The project includes all the works required to complete the unfinished project and realize a modern railway line, which shall meet the European standards.
The tendering process for works under this project is on-going and is done outside the ECEPP system.

4. Client Address
The client's address is for information only. To register interest, access the documentation using the available links. Participants must use the ECEPP message centre for communication with the client.
Mihajlo Tilic, PIU Team Leader
Public Enterprise for Railway Infrastructure Railways of Republic of North Macedonia Skopje
Jordan Mijalkov 50b
SkopjeEmail: m.tilic@mzi.mk
1000
North Macedonia
Tel. 00389 22449625