Ebrd Contract Award Notice
Tender/Contract Reference No: 8109726: Rehabilitation of pumping stations (including chlorination units) and installation of metering and control equipment (individual and bulk meters, telemetry)
Scope Of Contract: Bosnia and Herzegovina (the Borrower) has signed a loan agreements with the European Bank for Reconstruction and Development (the Bank) for financing of the Sarajevo Water Project (SWP.) The Project will be implemented by the Cantonal Public Water Utility Company KJKP Vodovod i Kanalizacija d.o.o. Sarajevo (the Employer). The first tranche of the loan amounts to 10 mil. EUR and the Employer intends to apply the proceeds of this loan toward the cost of goods, civil works and consulting services, to be procured for the SWP.
Contracts will be subject to the Bank's Procurement Policies and Rules.
The Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan:
Contract No.2: Reconstruction of pumping stations and installation of metering and control equipment toward Sarajevo Water Supply Project Ref: ViK - 02/2019
The pumping stations requiring major reconstruction and overhaul are:
- Pumping station Bacevo;
- Pumping station Center;
- Pumping station Alipasin Most.
All three pumping stations mentioned are of the great significance for the water supply network of Sarajevo.
Subject of consulting services for supervision of works will include: supervision of construction (reconstruction/extension), assembly works, hydro-mechanical works (replacement / installation of new pump aggregates with associated hydrometer components), electrical works (reconstruction of 10 - 20 kV power units and transmission lines, electric motor divisions and remote control and management systems) and commissioning. During the execution of works, the Employer and the Contractor must ensure continuous supply of drinking water, with only shorter interruptions in supply, meaning only a few hours daily.
In addition to the Pumping Stations, on existing water pipelines, for the purpose of continuous monitoring and control of water flow, the plan is to construct the relevant shafts and to install the necessary armature and the necessary fitting pieces. The shafts will be constructed at the following locations:
- Monitoring shaft at the crossing of Marsala Tita and Hamze Hum streets.
- Flow/pressure monitoring and control shaft at the Baruthana street.
- Flow/pressure monitoring and control shaft at the Grlicica brdo street.
The procurement procedure to be applied is an Open tendering - single stage procedure.
The works contract is expected to be awarded and start in Q1 of 2019.
Duration of Contract: 270 days
Contract Award Date: 24/09/2019
Revised Scope Of Contract: Not Revised
Awarded Tenderer(s):
Unioninvest holding d.d.
Grbavicka 4, Sarajevo, 71000, Bosnia And Herzegovina
Tender price at tender opening: EUR 6,435,581.33
Evaluated Tender Price (in evaluation currency): EUR 6,435,581.33
Evaluated Tender Price (Euro Equivalent): € 6,435,581.33
Contract Price (in evaluation currency): EUR 6,435,581.33
Contract Price (Euro Equivalent): € 6,435,581.33
Is this a JVCA: Yes
JVCA Details:
Unioninvest holding dd Sarajevo
Grbavicka 4
71000 Sarajevo, Bosnia And Herzegovina, 387
Lead partner: Yes
Deling doo Tuzla
Sici bb
75000 Tuzla, Bosnia And Herzegovina, 387
Lead partner: No
Evaluated Tenderer(s):
STRABAG AG
Ortenburgerstrasse 27, Zmaja od Bosne 11, 71000 Sarajevo, Bosnia and Herzegowina, Spittal an der Drau, 9800, Austria
Tender price at tender opening: EUR 10,527,771.85
Evaluated Tender Price (in evaluation currency): EUR 10,527,771.85
Evaluated Tender Price (Euro Equivalent): € 10,527,771.85
Reason For Rejection: Not the lowest evaluated
Is this a JVCA: No